Advertisment
Community
1 November, 2024
Kerb works
KERB and channelling along Warner St, on the southern side, from Wharf St through to Grant St, in Port Douglas is soon to be replaced.

Works will include removal of old kerbing and replacement with new kerbing, replacement of driveways if required, industrial grade driveways (where required), and backfill behind new kerbing and new asphalt from new kerb to existing asphalt.
A Douglas Shire Council spokesman said the project was expected to take eight weeks, with the aim to start the work before Christmas.
Read More: Port Douglas
Advertisment